  • Painting renovation and anticorrosion construction technology of color steel tile in workshop
  • Author / collation: YueShun chimney anticorrosion Co., Ltd. release time: October 20, 2019
  •  Painting renovation and anticorrosion construction of color steel tile in workshop

    Jiangsu YueShun Construction Engineering Co., Ltd

    Jiangsu YueShun Construction Engineering Co., Ltd. is a comprehensive enterprise specializing in high-altitude construction, maintenance, installation, anti-corrosion and thermal insulation, waterproof and leakage stoppage. With the approval and registration of Jiangsu Provincial Administration for Industry and commerce, the company has the independent legal personality, the company's construction characteristics are "no production, no need for hands, fast, high quality and reasonable price". The company promises that "the project quality shall be guaranteed, regular return visit, and the safety responsibility shall be borne by itself".

    requirement

    I. project status analysis

    1. Corrosion degree of roof color steel tile.

    2. There are rust spots on the surface of color steel tile.

    3. The original anticorrosive paint has peeling off and peeling.

    II. Analysis on construction conditions of color steel tile renovation and painting project:

    1. Climatic conditions:

    The climate wind is suitable for the paint working conditions. The construction method should be adjusted or stopped in rainy season. The surface coating of color steel tile should be carried out under good weather conditions. Due to the good wind force, the wind force is not less than grade 5 in construction.

    2. Personnel conditions:

    Have the ability to work at height, have rich experience in high-altitude operation, and pass the physical examination and safety technical training, and can only work after passing all aspects.

    3. Equipment conditions:

    Spraying equipment and tools are in good working condition.

    III. construction method:

    Comprehensive engineering status and construction conditions analysis:

    The surface of color steel tile can be constructed manually or mechanically.

    IV. construction method of main procedures:

    Painting renovation construction of colored steel tile roof of workshop.

    1. Operation procedure:

    Safety protection measures -- grinding treatment of color steel tile in workshop -- quality inspection -- spraying primer once -- quality inspection -- spraying topcoat once -- project acceptance.

    2. Base treatment

    2.1 bottom layer removal process:

    For the treatment of base course surface, mechanical rust removal method shall be adopted for color steel tile before construction. Corner grinder, steel shovel, wire brush, file and other tools shall be used to remove all dead corners. No removable rolling skin is allowed on the steel surface, and there must be no welding slag, welding scar, dust, oil stain, rust layer, etc. the treatment grade shall reach ST3, that is, no visible metal surface after treatment And there is no attached oxide skin, rust and other attachments. In order to increase the adhesive force of the coating, the electric polishing machine was used to treat the substrate as a whole. Wipe off the dust and other attachments on the base with a clean cloth with a brush. After the self inspection and inspection of the color steel tile of the factory building is qualified, the site representative and supervisor of Party A shall be asked to hand over the painting team immediately after passing the inspection. It is not allowed to get damp, pollute or stay overnight. The primer must be applied within 12 hours. The renovation and painting construction of color steel tile on the roof of the workshop can ensure that the color will not be decolorized for more than five years, and rust will not occur for more than five years.

    3. Quality inspection of anticorrosive coating

    After the coating is cured, all defects shall be inspected.

    (2) appearance inspection.

    1) visual inspection.

    2) the surface of anti-corrosion coating shall be flat, smooth and free of leakage.

    1. The thickness of coating film should be uniform.

    2. No wrinkle, drop and blister.

    3. The color distribution is consistent

    4. Good adhesion and clean appearance.

    5. The construction site is well maintained.

    6. Party A's facilities are free from abuse and damage.

    V. painting operation procedures:

    1. Before work, carefully check the painting equipment, Polish auxiliary materials, safety rope and safety belt for damage. Ensure that the performance of the equipment is good, and the same kind of equipment can be used.

    2. Construction personnel must wear work clothes before work, fasten safety belt and safety lock (on safety rope).

    3. The upper and lower temporary nurses should stick to each construction site at the same time, earnestly perform their duties, pay attention to potential safety hazards at any time, and timely report any problems found.

    4. Safe operation, civilized construction, no laughing, fighting, to ensure the quality of engineering service.

    5. It is not allowed to take the goods of Party A's customers without permission, and shall not damage the facilities of the four parties or customers.

    6. High altitude operation personnel and on-site supervisors must obey the unified command and management of the construction director.

    Paint introduction:

    1. Color steel tile primer: Alkyd iron red primer;

    Composition: refined dry vegetable oil, modified alkyd resin, iron oxide red, etc

    Anti rust pigment, physical pigment, dispersant, anti sediment agent, drier

    Solvent, etc.

    Wet film thickness: 50 μ M

    Dry film thickness: 35 μ M

    Coating method: high pressure airless spraying, brush coating and rolling coating.

    Dry time: 28 hours.

    2. Color steel tile finish: acrylic finish;

    Composition: acrylic paint is made of styrene resin, polyacrylate, polyester resin, chlorinated rubber, curing agent, leveling agent, defoamer, high-grade filler, etc.

    Basic performance:

    1. The paint film is plump, smooth, bright and beautiful.

    2. Good adhesion and good adsorption to metal and cement surface.

    3. Wear resistance, impact resistance and good flexibility.

    Excellent corrosion resistance to acid, salt and water.

    5. Excellent weather resistance, light retention and color retention.

    6. Brush coating, spray coating and roll coating can be used.

    7. Drying time: 3 hours for surface drying and 28 hours for actual drying.

    8. Wet film thickness: 48 μ M

    9. Dry film thickness: 35 μ M

    When the temperature of Jiangsu YueShun high altitude company is below zero in winter, antifreeze measures should be taken during chimney construction

    1. Construction safety assurance system and measures

    1.1 safety management objectives

    Death accident, serious injury accident and major fire accident are zero, and minor injury rate is within zero.

    1.2 technical measures for safety organization

    1) Technical management measures

    ① Carefully prepare construction organization design, operation instruction, and detailed safety construction measures.

    ② Efforts should be made to adjust the cross construction on the construction site.

    ③ Work out safe construction plan carefully.

    2) Safety protection measures

    ① The project adheres to the guiding ideology of "safety production, responsibility is more important than Mount Tai", implements the policy of "safety first, prevention first", and establishes a safety construction management system in which the project manager is in charge of the safety construction, the full-time safety officer is specially responsible for the safety construction, and the part-time safety officer of each construction team is responsible for the specific work.

    ② All construction personnel must seriously abide by the relevant regulations for safe construction of electric power engineering and various factory rules and disciplines of the owner. They can only participate in the construction after passing the training and study of the safety supervision department of the owner and passing the examination.

    ③ All construction personnel must hold the "special type of work operation certificate" for high-altitude operation, and operate the construction in strict accordance with the specification of high-altitude operation.

    ④ Establish and improve the safety construction rules and regulations, and strictly implement the construction "safety agreement" regulations. The safety supervision department of the owner has the right to deal with and punish the construction safety violations and personnel.

    ⑤ Before the construction, the safe construction area should be set up first, the safety construction area should be set up with fence or rope with eye-catching safety signs, and several warning signs of "working at height" should be set up. It is strictly forbidden for non construction personnel to enter the construction site without permission.

    2. Quality assurance system and measures

    2.1 in order to be responsible for the owner and ensure the construction quality, our company takes the construction project as the center, adheres to the implementation of total quality management, establishes the quality management organization corresponding to the construction project, fully materializes the planning, implementation, inspection, treatment and other work in the project quality management, and gradually forms a kind of mutual restriction and mutual guarantee between construction production and quality management Relationship.

    2.2 quality assurance measures

    2.2.1 quality management system

    1) Implement quality assurance standards.

    2) The construction department shall carry out the construction in strict accordance with the industry standards, timely report the problems encountered in the construction process with the quality inspection department and the technical personnel in charge of the project, and make rectification suggestions.

    3) Actively cooperate with and obey the guidance and management of the industry's competent departments, listen to opinions with an open mind, and make strict corrections.

    4) The construction personnel should carefully do a good job in quality self inspection, mutual inspection and process handover inspection, and make the construction post responsibility record and the original construction record. The recorded data should be true, comprehensive and timely.

    5) Leaders at all levels must insist on participating in the acceptance of work quality. The phenomena of violating construction procedures, norms and regulations, unqualified projects and accident signs found in the inspection shall be recorded one by one, and treatment measures shall be studied and formulated in time.