construction plan

Current location: home page > construction plan
  • Chimney lighting design and construction scheme
  • Author / arrangement: YueShun chimney corrosion protection Co., Ltd. release time: September 3, 2019
  •  Chimney lighting design and construction scheme

    Pre construction preparation

    Section 1 preparation for construction

    1. Technical preparation

    1.1 contract: strictly grasp the rights and obligations of the contract terms, and ensure to formulate construction measures and organize technical disclosure according to the contract technical data and relevant atlas. The steps of drawing review can be divided into three stages: study, preliminary review and joint review.   

    Stage 1.2. The main purpose of studying drawings is to find out the construction scale and technological process, structural form and structural characteristics, construction methods, main materials and special materials, technical standards and quality requirements, etc., and fully understand the design intent and construction requirements.  

    1.3 before the commencement of construction, relevant technical documents shall be studied to understand the quality standard requirements and construction period requirements of the project, and the respective responsibilities, work scope and obligations of the contractor and the owner specified in the contract documents. The contract shall be strictly performed during the construction to avoid the occurrence of breach of contract.   

    1.4 in order to ensure the safe, high quality, low consumption and efficient completion of the project, the project manager makes technical disclosure to the construction personnel.   

    2. Material preparation

    According to the engineering quantity and construction schedule, according to the specifications and quantity requirements in the design drawings and construction organization design, timely organize the mobilization of various materials and construction machinery, and assign special personnel to be responsible for the acceptance, implement the storage site for large equipment, pipe materials and various materials along the construction site, and take wind, rain and anti-theft measures.   

    3. Labor organization preparation

    3.1. The project management department shall formulate the labor plan for each stage of the project construction according to the quantities, contract period, construction schedule, labor productivity and other factors, and organize the construction personnel of each professional construction team to enter the site in time.   

    3.2. Each professional construction team shall organize the labor force to enter the site according to the plan to meet the quantity required by the project progress, especially to ensure that it has the necessary technical quality to complete the project.

    3.3. The operators engaged in technical type of work must receive corresponding professional training and have employment certificate to ensure that they can work with certificate. Especially for plumbers, crane workers, electricians and other special technical types of workers, training should be strengthened to ensure their technical quality.

    4. Preparation of construction machinery and equipment, the model and quantity of mechanical equipment used in construction shall be overhauled in advance according to the requirements of construction organization design, so as to meet the construction requirements. The on-site inspection instruments shall be calibrated and records shall be established.

    Section 2 construction site preparation

    1. The location of office buildings and residences on the construction site shall be in proper position, and the open space shall be used as the address of the project management department. Temporary offices, dormitories and warehouses shall be established at this location, and construction signboards shall be set up.

    2. Water and electricity for construction and domestic use

    2.1. Pay attention to rational use and save water during construction.

    2.2. The temporary power supply line leading to the construction site shall be erected by itself, and the power distribution facilities and lighting facilities shall be installed. The erection and installation of temporary power supply lines must meet the requirements of relevant specifications for temporary power consumption.

    Section 3 external coordination

    1. Do a good job in contact with design, owner, supervision and other departments, and timely communicate with relevant issues on the project.

    2. Before the construction, the construction cooperation meeting of relevant units within the construction scope shall be held to clarify the construction purpose, construction method and construction progress, so as to strive for support and cooperation from all aspects.


    Construction process and method

    1、 Construction method

    1. The project adopts the method of hanging without scaffold for construction.

    2. The outside of chimney is constructed by hanging basket, and the size of hanging basket is made according to the inner diameter of chimney outlet.

    3. Triangle support is installed at the top of chimney, which is made of Φ 8 steel pipe. The support is supported at the top of chimney, and the fulcrum is connected with the channel steel transverse to the top opening.

    4. The middle hanging pulley of the channel steel is used to lift the material, and the suspension point of the lifting material is separated from the suspension point of the lifting basket.

    5. There are two channel steels at the top, one of which is used as the suspension point of lifting materials, and the other is used as the suspension point of lifting basket.

    2、 Construction process

    1. The dust and attachments on the outer wall of chimney must be cleaned with high-pressure water gun,

    2. External wall painting of chimney

    The selected raw materials, design requirements and consistency of construction mortar shall be trial mixed in advance. Slow speed mortar mixer can be used on site, and the proportion and dosage of each component must be strictly controlled.

    Sand should be coarse sand. When the thickness of repair layer is less than 1cm, the sand should be screened by 5mm; when the thickness of repair layer is greater than 1cm, medium coarse river sand should be used, with fineness modulus of 2.5 ~ 3.1. First, add powder and sand to the weighed cement and mix it evenly, slowly and fully. Generally, the mixing time is 3min. The prepared mortar should be used within 45 ~ 60min. If the mortar is not used in time and the mortar is dry and hard, it can not be mixed with water again, and it should be discarded.

    The average thickness of plastering mortar on the outer wall of chimney is about 15mm.

    3. Surface repair treatment

    In order to improve the adhesion of mortar, if there is any attachment on the outer surface of chimney, the electric grinding wheel must be used to polish the surface, and the cement mortar should be used to fill the surface, and the cracks should be filled up.  

    5. Beautification of chimney outer wall

    After the external wall of the chimney is painted and dried naturally, we paint and beautify the outer wall of the chimney.

    (1) The outside of chimney is painted with "red and white" pattern color mark paint.

    Eight nylon ropes were hung around the platform at the top of the chimney, and the floating dust on the outer wall of the cylinder body was cleaned up by the climbing workers from top to bottom,

    The color code paint is applied in + 5 - + 32m section. The color code paint is a special paint for chimney beautification. It is applied three times with grade I adhesion, acid corrosion resistance, aging resistance and good color retention. The color code paint is applied when the water content of the chimney is less than 6% at the depth of 20 mm on the outer surface of the chimney. B86-2 acrylic high altitude structure marking paint produced by Jiangsu Lanling Chemical Industry Group Co., Ltd. is applied.

    The paint is composed of high-grade acrylic resin, pigment, auxiliary agent, solvent, etc. the paint film has outstanding weather resistance and light and color retention; the physical and mechanical properties of the film are excellent, heat and cold resistance; the color of the film is bright and full; the paint is fast drying and can be applied at low temperature.

    The physical parameters are white and bright red


    Quality assurance measures

    1. Before construction, all construction personnel shall be organized to study and discuss the construction scheme, and the construction contents, quality requirements and precautions shall be explained to the construction personnel in detail. The raw materials entering the site must have product qualification certificate.

    2. After the construction unit finds out the problems in the next process after the rectification, the construction unit must formulate the construction scheme in time.

    3. The construction shall be carried out in strict accordance with the product instructions and technical requirements.

    4. Subject to the supervision of Party A, Party B's quality inspectors shall track and supervise the whole process of construction.

    5. To high quality project as the goal, and each process, each link to each class and individual.

    6. Construction shall be carried out in strict accordance with code for construction and acceptance of chimney Engineering (gbj78-86) and code for construction and acceptance of building anti-corrosion engineering.

    7. Establish a quality leading group with the project leader as the first responsible person, establish the ideology of "quality first, safety first", strengthen the quality concept of all staff, and strive to create high-quality projects.

                       

    Safety measures

    1. Climbing workers must be examined by the medical department and qualified, and trained by the labor department to work with certificates.

    2. Safety helmets must be worn when entering the construction site, and safety belts must be worn by climbing workers.

    3. It is strictly forbidden to work at heights after drinking or with diseases.

    4. Lifting equipment shall be in charge of by special personnel, and non lifting personnel are strictly prohibited to operate.

    5. No fireworks are allowed on the construction site. Inflammable and explosive materials should be stacked in a centralized manner. Fire fighting equipment should be equipped and special personnel should be assigned to take care of them.

    6. Safety warning lines shall be set up in the construction area, and warning signs shall be hung at the entrance and exit. The distance from the warning line to the chimney shall not be less than 1 / 10 of its height and not less than 10 m.

    7. In case of thunderstorm and strong wind, the climbing operation shall be suspended and the construction shall be carried out after the wind and rain.

    8. The safety supervisor shall supervise the construction on site, and timely stop and correct the violation found during the construction.

    9. Establish a safety management system with the project leader as the first responsible person.

    10. Safety Objective: no one injured accident and major mechanical damage accident.