  • Safe construction method of demolishing cement chimney
  • Author / collation: YueShun chimney corrosion protection Co., Ltd. release time: June 22, 2020
  •  Chimney demolition

    Chimney demolition is a dangerous thing. What should be paid attention to on-site construction of chimney demolition? Abide by relevant national laws and regulations on environmental protection, relevant provisions of local government and construction unit: take measures to control all kinds of dust, waste gas, waste water, waste liquid, solid waste, noise and vibration on the environment.

    1. Do not incinerate garbage and other substances that produce smoke and odor on site.

    2. Construction and domestic sewage shall be discharged into the sewer, and shall not flow randomly.

    3. The slurry water should be treated properly, and it should not be discharged directly without treatment.

    4. Effective measures should be taken to control the dust in the construction process, the construction road should be cleaned every day, the water should be sprinkled regularly, and the speed limit of vehicles should be limited.

    5. Put the waste machine oil into the oil barrel and treat it regularly.

    6. It is forbidden to use toxic and harmful wastes as earthwork backfill.

    7. The noise produced by machinery and construction is small.

    8. Arrange the work sequence reasonably, and arrange the noisy work in the daytime as far as possible, so as to reduce the impact on other personnel's rest at night.

    9. Personnel engaged in high-altitude operation must abide by the factory rules and regulations, and must be in good health. Personnel who are suffering from mental illness, epilepsy, hypertension, heart disease, etc. who are not suitable for high-altitude operation are not allowed to participate in high-altitude operation. It is forbidden to work at heights when the staff are found to be drinking or in low spirits.

    10. Each construction personnel must be equipped with double insurance measures. It is strictly forbidden to talk to each other during construction.

    11. Construction personnel should wear goggles and dust masks when dismantling

    12. In the process of garbage handling, materials that may produce dust are treated with water or sprayed with water. Fixed nozzle system is installed on site to wet dusty materials before loading and unloading.

    13. Vehicles carrying garbage shall not be loaded beyond the baffle.

    14. The driving route of vehicles shall be far away from the storehouse easy to raise dust, and the construction road shall be watered and cleaned regularly.

    15. Health care measures for special operators in order to ensure the health of construction personnel, the Contractor shall provide first-aid bandage and first-aid drugs in the project department. At the same time, strengthen the contact with the local medical and health centers, and rescue the emergency patients in time.

     Safe construction method for demolition of cement chimney (Fig. 2)

    Jiangsu YueShun Construction Engineering Co., Ltd. was founded in the high altitude construction and repair and anti-corrosion engineering company, which is specialized in non-stop production, no scaffolding and high-altitude suspension construction, with grade-1 high-altitude safety qualification, grade-1 high-altitude anti-corrosion construction qualification and grade-2 construction qualification. It has developed a large high-altitude construction and maintenance and high-altitude anti-corrosion construction enterprise in Jiangsu Province, which integrates scientific research, design and construction. It has three technical and construction organization systems of high-tech scientific research, high-tech engineering design and high-level maintenance engineering construction. The company has a first-class technical construction team, including 36 senior titles and 126 intermediate titles. It has five branches and 18 offices under the jurisdiction of the company. It has solved a number of "high, large and difficult" special engineering projects for hundreds of enterprises in China, filling the gap in the history of Chinese architecture.

    Jiangsu YueShun company has realized microcomputer management in administration, accounting, construction, scheduling and other links. The company has been successively rated as a member unit of China Industrial Corrosion Protection Technology Association, an enterprise of valuing contract and keeping promise, and a member unit of Yancheng Enterprise Credit Management Association, which more clearly reflects the company's enterprise spirit of seeking truth, striving forward, developing and innovating. Since its establishment, the company has adhered to the road of technological innovation, scientifically adopted the new technology of "no scaffold, high-altitude suspension operation", successively undertook various kinds of high-altitude maintenance, anti-corrosion and leakage stoppage projects, etc., and has been rated as "advanced enterprise of high-altitude maintenance" by relevant provincial and municipal departments for many years. The company specializes in wind power tower anti-corrosion maintenance, wind power tower cleaning and painting, wind power tower spray writing, new brick chimney, new cement chimney, new concrete chimney, chimney maintenance, chimney desulfurization, chimney color ring, chimney reinforcement, chimney heightening, chimney anti-corrosion, tower anti-corrosion maintenance, new chimney, cooling tower new, cooling tower new, new chimney, chimney demolition Chimney decoration, chimney beautification, chimney construction, chimney installation, chimney demolition, slipform chimney, chimney maintenance company. High altitude operation, high-altitude building, high-altitude maintenance, high-altitude installation, high-altitude anti-corrosion, high-altitude cleaning, high-altitude beautification, high-altitude decoration, chimney anti-corrosion, crane anti-corrosion, gantry crane anti-corrosion, chimney ladder paint anti-corrosion, iron chimney paint anti-corrosion, pipeline anti-corrosion and thermal insulation, oil tank anti-corrosion, cooling tower anti-corrosion, steel structure anti-corrosion, steel frame anti-corrosion, anti-corrosion engineering company. Waterproof and leakage stoppage, tunnel plugging, sewage pool plugging, cooling tower anti-corrosion and plugging, cooling tower anti-corrosion and leakage stoppage, basement plugging, leakage stoppage engineering, external wall cleaning, building cleaning, glass curtain wall decoration, external wall cleaning, chimney painting, chimney ash cleaning, cement silo ash cleaning, chimney writing, high-altitude cleaning engineering, lightning rod installation and replacement, beacon lamp installation and replacement, chimney demolition without production stop Heightening, chimney inclination correction, chimney lining replacement. Carbon fiber reinforcement, chimney carbon fiber cloth reinforcement, chimney obstacle lamp maintenance and installation, brick chimney removal, cement chimney removal, tower maintenance and anti-corrosion, tower removal, urea tower anti-corrosion, granulation tower anti-corrosion maintenance, coal conveying trestle anti-corrosion, chimney packing hoop, pool plugging, mine plugging, reservoir leakage stoppage, pressure sealing and other high-altitude operation projects!

    Jiangsu YueShun company formulates the construction regulations of environmental protection, construction and anti-corrosion operation, and the technical safety rules for aerial work construction, environmental protection, construction and anti-corrosion operation, etc. It provides strong guarantee for the company's "safe construction" for many years. Our company is fully equipped to perform large, medium and small projects, which is the strong backing for you to solve problems, eliminate hidden dangers and create a first-class enterprise. For many years, it has always been in line with the service tenet of "safety first, quality first" and "follow-up service, implementation of three guarantees and regular return visit" for various projects. The company has four branches (high-altitude maintenance company, high-altitude anti-corrosion company, construction and installation company, high-altitude cleaning and plugging company) and 65 engineering teams under its jurisdiction. It has solved several "high, large and difficult" special engineering projects for thousands of enterprises in China, and filled the gap in China's architectural history.

    The general manager leads all the staff of the company to express heartfelt thanks to the leaders at all levels, all colleagues, new and old customers who care and support the development of our company. The company will carry forward the enterprise spirit of "first class, transcendence, harmony and dedication", adhere to the business philosophy of "strategy is the key point, innovation is the soul, quality is the root, brand is the life", and abide by the business principle of "honesty first, faith-based", sincerely and friendly cooperation with you, sculpture fine projects, and build high-tech base industry.

Copyright? 2018 Jiangsu YueShun Construction Engineering Co., Ltd. www.jsyueshen.com all rights reserved XML map
Tel: 0515-88266009; mobile phone: 15351551158; 13705105077, manager; address: room 208, Party mass service center, Sanzao village, Xinxing Town, Yancheng City