Anti corrosion of cooling tower

Current location: home page > Exhibition project > Anti corrosion of cooling tower
  • Anti corrosion of cyanoagulation material for cooling tower
  •  Anti corrosion of cyanoagulation material for cooling tower

    Jiangsu YueShun construction engineering aerial Construction Co., Ltd. is a professional high-altitude operation enterprise. It is located in the coastal central city of Jiangsu Province, the emerging industrial and commercial city in the Yangtze River Delta, and the wetland eco-tourism City Yancheng. Yancheng is located in the central coastal area of Jiangsu Province, between 32 ° 34 ′ - 34 ° 28 ′ N and 119 ° 27 ′ - 120 ° 54 ′ E. It is adjacent to huaizhou city and huaizhou City, bordering on Huanggang City and Nanwang city in the West. Yancheng is a prefecture level city with large land area and long coastline in Jiangsu Province.

    Our company has been engaged in chimney reconstruction, new chimney construction, chimney maintenance, cooling tower anti-corrosion, new cooling tower construction, steel structure installation and anti-corrosion, pipeline anti-corrosion and insulation, underground waterproof and leakage stoppage projects of power plants, chemical plants, steel plants, smelters and other enterprises. Our company now has the first grade qualification for professional contracting of waterproof, anti-corrosion and thermal insulation engineering, and the second grade qualification for general contracting of construction engineering.

    The good quality of the staff and workers is the source of the good quality of the staff and workers, and the development of the staff team depends on the excellent quality of the staff and workers. The core of our corporate culture lies in the concept, which determines the thinking mode and behavior mode of enterprise members, and also provides continuous spiritual power for the innovation and development of enterprises. Over the years, the leadership team of our company has inspired the morale of the staff with the wisdom of the group, the spirit of cooperation and the fresh vitality, fully tapped the potential of the enterprise, combined with the survival and development of the enterprise, and won the development of the enterprise with the work style of active exploration and storm.  

    Using advanced technologies such as "no scaffold, no production stop construction and high-altitude hanging operation", we provide you with:

    (1) High altitude building projects: new brick chimney (within 65m), concrete chimney slipform (within 240m), chimney drawing design, foundation pouring, contracting for labor and materials, new construction of wheel kiln and kiln, new construction of water tower, granary, cement storage tank, chimney heightening engineering.

    (2) High altitude demolition projects: various chimney demolition, water tower demolition (manual demolition, directional demolition, blasting demolition), tower demolition, urea prilling tower demolition, television tower demolition, iron cutting frame removal, high-altitude concrete frame demolition, and other high-altitude demolition projects with high difficulty.

    Anti corrosion construction scheme for cooling tower of power plant

    (3) High altitude Engineering: chimney reconstruction, chimney ash removal, chimney inspection, chimney flaw detection, chimney crack repair, chimney hoop reinforcement, chimney removal and heightening, chimney correction, chimney lining replacement, chimney top mouth repair, maintenance or replacement of lightning protection facilities, chimney painting, rotary kiln, kiln, chimney smoking capacity is not enough.

    (4) High altitude installation engineering: chimney installation lightning rod, beacon light, lamp, steel chimney installation, chimney installation ladder, platform, protective net, chimney top ladder installation, various tower installation, workshop glass installation, etc.

    (5) Flue gas desulfurization project: a series of projects such as pasting foam glass brick on various chimneys, flues and desulfurization towers, coating ls300 special acid resistant mortar, OM, polyurea, PV and other special desulfurization and anti-corrosion coatings for chimneys.

    (6) High altitude anti-corrosion engineering: chimney painted with color ring AIDS, chimney painted, chimney painted, chimney writing, cooling tower anti-corrosion, sewage pool anti-corrosion, acid-base pool anti-corrosion, steel structure anti-corrosion, furnace frame anti-corrosion, pipeline anti-corrosion and thermal insulation, wind turbine tower anti-corrosion (cleaning, spray), various tower anti-corrosion, chimney anti-corrosion (platform, ladder, protective net), oil tank anti-corrosion , gantry crane anti-corrosion, hotel, building external wall painting, crane anti-corrosion engineering.

     Anti corrosion of cyanoagulation material for cooling tower (Fig. 2)

    Appraisal and analysis of cooling tower

    It can be seen from the on-site inspection that the concrete pillars, inclined columns, ring beams and tower walls are damaged to varying degrees, among which the ring beam and tower wall concrete are most seriously damaged.

    A small number of concrete column concrete fell off along the direction of stirrup. Although some of the column surface concrete did not fall off, there were slight expansion marks on the column surface, which indicated that the reinforcement inside the column had been corroded. With the volume expansion of steel corrosion, it was only a matter of time before the protective layer fell off. From the photos of ring beam and tower wall, it can be seen that the protective layer at the bottom of ring beam and tower wall has fallen off in large area, and the reinforcement is seriously corroded.

    Due to the corrosion of reinforcement and the falling off of protective layer, the effective cross-sectional area of beams, columns and tower walls becomes smaller, resulting in the decline of the overall bearing capacity of the structure, which directly affects the mechanical performance of the structure. The stirrup is located on the outside of the main reinforcement. After the reinforcement corrosion, it not only affects the bearing capacity of the inclined section of the structure, but also reduces the binding force on the concrete, and indirectly affects the bending capacity of the structure. On the other hand, steel corrosion also reduces the bond strength between reinforcement and concrete.

    According to the above inspection results, it can be determined that the damage of the components has seriously affected the bearing capacity of the main structure, and the bearing capacity of the main structure of the building has not met the requirements of the current code

    Construction procedure of cooling tower

    1. Surface treatment of cooling tower and herringbone column: wash with water, remove warping and loose concrete.

    2. Remove rust from exposed reinforcement and brush it with antirust paint.

    3. Repair the surface of cooling tower and herringbone column with polymer mortar.

    4. After repair, use chlorosulfonated anti-corrosion paint to brush twice for anti-corrosion.

    Construction method of cooling tower

    1. Basic requirements and treatment:

    The surface of base course shall be flat, rough, clean, free of oil stain, floating ash, sand, hollowing and cracks. However, high pressure water shall not be used before construction.

    When the requirement of interfacial adhesion is very high, the reinforced interface treatment agent can be applied in advance

    Safety measures

    1. They must be trained by the medical department and have the physical examination.

    2. Safety helmets must be worn when entering the construction site, and safety belts must be worn by climbing workers.

    3. It is strictly forbidden to work at heights after drinking or with diseases.

    4. Lifting equipment shall be in charge of by special personnel, and non lifting personnel are strictly prohibited to operate.

    5. No fireworks are allowed on the construction site. Inflammable and explosive materials should be stacked in a centralized manner. Fire fighting equipment should be equipped and special personnel should be assigned to take care of them.

    6. Safety warning lines shall be set up in the construction area, and warning signs shall be hung at the entrance and exit. The distance from the warning line to the chimney shall not be less than 1 / 10 of its height and not less than 10 m.

    7. In case of thunderstorm and strong wind, the climbing operation shall be suspended and the construction shall be carried out after the wind and rain.

    8. The safety supervisor shall supervise the construction on site, and timely stop and correct the violation found during the construction.

    9. Establish a safety management system with the project leader as the first responsible person.

    10. Safety Objective: no one injured accident and major mechanical damage accident.